Sunline Energy Logo

Sunline Energy Reviews

star star star star star_half

7.0

Overall Score

Star Rating

info

4.5

star star star star star_half

124 Reviews

Review Breakdown

5 grade

71%

4 grade

15%

3 grade

7%

2 grade

1%

1 grade

6%

Sentiment Criteria

Value

star star star star star

Quality

star star star star star_half

Service

star star star star star_half

Trustworthiness

star star star star star_half
cancel
info
check_circle

Verified Customer

check_circle

Review Source

star star star star_border star_border

TW San Diego, CA

They did a good job designing and installing the system. But they left trash all over my property, lost the key to my property, left dust and debris all over some unrelated electrical equipment, and destroyed some of my plants around the sides of the house. They also promised to connect a part of the new solar box so that I could monitor my energy consumption. They never ended up doing that part, then later quoted me an extra $300 to do it (the original agreement was to have them do it at install time, as part of the original quote). They did end up making most of it right. When I complained, they cleaned up the trash, replaced the plants, and reimbursed me for the cost of a new lock and key set. But they never connected the wires for energy consumption monitoring, and still want me to pay hundreds to get it done after-the-fact.

4 years ago

Sunline Energy Logo

Reply from Sunline Energy

Hi TW,

We appreciate your feedback and while this is not the experience of most customers, we are working to provide top quality service to every customer and apologize that you were not pleased with some aspects of the installation.
The consumption feature is not included as part of our contracts. This feature can be installed on about 30% of service panels with the standard equipment provided, but for the majority of service panels additional hardware and labor is needed. This process may also involve sorting out the existing wires for the circuits in the home in order to feed them through the hardware responsible for providing the consumption data. As you might imagine, this can take some time if the wire management of the existing circuits is poor.

As for the trash, plants and lock and key set we will add that to our report to ensure that this feedback is taken into consideration and apologize for any inconvenience caused

Dec. 10th, 2021

check_circle

Verified Customer

check_circle

Review Source

star star star star_border star_border

Steve Grebenstein La Mesa, CA

Wanted to add 2 or 3 more panels to my array so I hah to call 3 times before anyone called back, and then was persuaded not to add them. I was very disappointed. Initially, my system was designed by one of your owners, who subsequently was incarcerated, but he was a great guy & very helpful. He said that I could add panels whenever I wanted.

3 years ago

Sunline Energy Logo

Reply from Sunline Energy

We're happy to look into what it would take to expand your system. Feel free to call into our office during business hours 858-252-2280 (ext 5)

Dec. 9th, 2021

check_circle

Verified Customer

check_circle

Review Source

star star star star_border star_border

Ted Rancho Santa Fe, CA

Getting the solar system installed initially was fine, but the follow-ups on some of the issues I've had weren't addressed. I had one of the panels not generating much electricity and I wanted to add a few more panels. Someone from Sunline contacted me, I sent the information requested, but haven't heard back for 7 months. Still waiting.

4 years ago

check_circle

Verified Customer

check_circle

Review Source

star star star star_border star_border

Anonymous San Diego, CA

The equipment is good. During the installation there was an incident at the roof, one of the tiles was damaged and today I still haven't heard whether this is going to be completed. Installation was fast probably less than a day. They should just improve their follow up.

4 years ago

Sunline Energy Logo

Reply from Sunline Energy

Please contact your assigned project manager and we would be happy to address this.

Dec. 10th, 2021

check_circle

Verified Customer

check_circle

Review Source

star star star star_border star_border

Dan Baker San Diego, CA

Install was delayed and faulty. It took a lot of constant reminders for them to fix install issues to get the system working. Fortunately the issues were resolved.

4 years ago

Sunline Energy Logo

Reply from Sunline Energy

Hi Dan, thank you for getting in touch to let us know what went wrong.

Dec. 2nd, 2021

check_circle

Verified Customer

check_circle

Review Source

star star star star_border star_border

James Fallbrook, CA

Sometimes they don't always communicate very well. I don't really use equipment and my customers that use it haven't given any feedback.

4 years ago

Sunline Energy Logo

Reply from Sunline Energy

Thank you for your review, James. We take every criticism to heart and constantly try to improve our services.

Dec. 2nd, 2021

check_circle

Verified Customer

check_circle

Review Source

star star star star_border star_border

Mark Frederiksen Alpine, CA

Scheduled solar panel insulation for July 2021 and it's November and nothing has been done yet.

4 years ago

Sunline Energy Logo

Reply from Sunline Energy

Thank you for the feedback. I looked into your project and a 400 amp main panel service upgrade was added to the scope of work. Unfortunately these service upgrade dates are out of our control and we’re all at the mercy of SDG&E here. I show we finally have a service upgrade date in January. We look forward to completing your project as soon as possible.

Dec. 9th, 2021

check_circle

Verified Customer

check_circle

Review Source

star star star star_border star_border

Rob Dawson Norwalk, CA

Sales experience was horrible, installation had some snags, and monitoring is not at all proactive

4 years ago Edited January 10, 2024

Sunline Energy Logo

Reply from Sunline Energy

Hi Rob, thanks for flagging this up to us, we’re sorry to hear about your experience.

Dec. 2nd, 2021

check_circle

Verified Customer

check_circle

Review Source

star star star star_border star_border

David Kellerman San Diego, CA

Many issues with the project and three months later than projected

4 years ago

Sunline Energy Logo

Reply from Sunline Energy

Thank you for the feedback. A main panel upgrade was added to your project that required trenching. Unfortunately these service upgrades can added a significant amount of time to a project. I'll contact your estimator to ensure we're providing more accurate time frames. We appreciate your business and again thank you for the feedback.