G3 Solar Logo

G3 Solar Reviews

star star star_half star_border star_border

4.7

Overall Score

Star Rating

info

2.7

star star star_half star_border star_border

20 Reviews

Review Breakdown

5 grade

30%

4 grade

5%

3 grade

15%

2 grade

0%

1 grade

50%

Sentiment Criteria

Value

star star star_half star_border star_border

Quality

star star star_half star_border star_border

Service

star star star_half star_border star_border

Trustworthiness

star star star_half star_border star_border
cancel
info
check_circle

Verified Customer

check_circle

Review Source

star star_border star_border star_border star_border

Les Johnson Tooele, UT

It has taken almost 4 months from the time I signed to now and my solar is still not on. There was one problem that I needed to fix but it could have had it fixed if the people who installed the solar box had told me there was a problem with the pipe to the electrical panel. Instead it took me 3 weeks after the city inspection to get it fixed. Very frustrating. I had solar in a different state and only took one month. I missed all the savings during the summer and high heat.

3 years ago

star star_border star_border star_border star_border

Chad Johnson Bethel, OH

The sub contractor company caused major repairs needed. G3 is very slow in resolving. They replaced the roof, still working on getting bids for water damage to my ceiling and after months (started installation in Dec. 2023) , just got the solars working 2/27/24. The Sub contract broke my tv and G3 still has not reimbursed me for it. I have been the mediator through this entire process and provided evidence of the damage with dates and pictures. Still getting bids for interior repairs , still not received a check for my broken tv in which I have provided dates , pictures and evidence of damage and the sub contractor responded with an answer that was not even pertaining to the date of damage. No other communication with sub contractor has been had nor any proof given in defence. Management is very slow in getting repairs done, Very bad in making decisions and poor communication and with their own case managers. Case Manager is the barrier of complaints and takes a lot of heat for Managements lack of resolving issues.

1 year ago

star star_border star_border star_border star_border

Robert Uffman Lexington, KY

from the word "go" this company started with the Lie that the solar panels would take the place of the electric bill. that is why they take your electric bill to average out the cost of the panels that they figure you will need to power your house. they also said they worked in conjunction with Kentucky Utilities so after the panels were up for 90 days we would no longer receive an eclectic bill except for the cost of keeping the service and local taxes. i was told my panel cast would be the same as my current monthly electric bill for the next 30 years, which would be a savings due to electric company's rate increase. that was not the case either. so now i have to pay my electric bill almost the same cost as it was pre solar panels plus the monthly cost of the panels. we are currently looking into suing G3 Solar. Please do not fall for this scam.

1 year ago

star star_border star_border star_border star_border

Trish Ryan Sparks, NV

This organization was the prime contractor, subbing work out to a local organization Reno Solar. From the get go this organization has not maintained sensible and accurate engineering for our solar project, which had led to multiple delays and inaccuracies within the contract itself (and leading to questions regarding the validity of our project). Finally, after 12 painful months of dealing with this organization and their atrocious level of project manager turnover (6 project managers for our project in the course of 12 months), our solar system was turned on. Since then, after being provided empty promises of compensation for not only the loan payments we'd been paying for (despite having a non-operable system), to then being told we would be compensated for time between our authorization to operate and when G3 could actually pull it together and turn the system on (again, delays due to engineering errors on their side of the project), G3 has not come forward to make good on any of those promised items. Now, they have not provided all of the appropriate project close out work and routinely dismiss my and my husband's communication with them. For any consumers considering working with them, avoid this organization at all costs. The only appropriate retribution would be to see them go out of business.

2 years ago

star star_border star_border star_border star_border

Scott Lasater Hooper, UT

I I paid this company $73000 and gave them many months to install before the hot weather hit. That was the whole point in buying PV. Our house is large and cooling it is expensive during July thru September. They were slow, they came by many times with incorrect parts, they made excuses, and ultimately they cost me an additional $2000 in electric bills because they couldn't finish the job on time, and we all know how hot it was this summer. After all of the broken promises and failures, they offered to compensate me a measly $300. When a company takes $73000 to do a job, and it's not worth it to them to compensate the customer for their failures, it speaks volumes to their lack of interest in customer satisfaction. On top of that, they inspected the roof and said it was fine. Then the installer showed up and said it definitely wasn't. They can't even agree within their own ranks. I don't recommend this company at all. They lack integrity.

5 years ago

check_circle

Verified Customer

check_circle

Review Source

star star_border star_border star_border star_border

Anonymous Las Vegas, NV

Super slow on Install time. 3 months and still waiting. Most of my neighbors signup for solar after me and are already installed. I would never recommend this company!

3 years ago

star star_border star_border star_border star_border

Jim Jim

This is a horrible company to deal with. It took well over a year to get my solar installed. As soon as the loan got funded (prior to completion) the job just sat there. It is still not completed and I can’t get anyone to follow through with what they claim they will do. Oscar R, project coordinator, will set a date for completion and nothing will happen. He won’t respond to emails or call you back. Anyone looking for solar needs to find another company. This was my biggest mistake!!!

1 year ago

check_circle

Verified Customer

check_circle

Review Source

star star_border star_border star_border star_border

John Oshiro Henderson, NV

Took too long, they got my attic super dirty and they cracked a part of my wall from installing the solar. Still no pigeon guard on my panels.

3 years ago

star star_border star_border star_border star_border

Adrian Tracy

This company is a scam!! We’ve had our solar panels for over a year and are still paying a normal electric bill as well as the bill for the panels with no resolution from the company!! We’ve had issue after issue since the beginning!

1 year ago

star star_border star_border star_border star_border

Andrew Gomes

Awful experience. June of 2022 I committed to solar and all finances in order. February 2023 they are finally producing power. 8 months to get everything complete. Nothing like making payments and not producing any power. I was also promised a reimbursement check for the payments and wad never reimbursed. Terrible company don't waste your time.

2 years ago